Helping build a brighter future.
Green Gas Services, LLC
3939 S 500 W
Salt Lake City, UT 84123
United States of America
Process Location: Headworks Building
Project Specifications:
| Airflow Rate, cfm | 4,000 |
| Inlet H2S Conc., ppm | 10 |
| Peak Conc., ppm | 20 |
| INLET | OUTLET |
| 1-10 ppm H2S | 0.1 ppm H2S |
| > 10 ppm H2S | 1% of inlet |
Vessel Material: 8’1” tall x 7’ diameter FRP with UV Gel Resin
Scrubbing Media: Extruded Activated Carbon
Engineer: Aqua Engineering, Bountiful, Utah
System Commissioned: March 2026
Process Location: West Splitter Box
Project Specifications:
| Airflow Rate, cfm | 300 |
| Inlet H2S Conc., ppm | 5 |
| Peak Conc., ppm | 10 |
Removal Efficiency: 99%
Vessel Material: 5’ tall x 3.5’ diameter FRP with UV Gel Resin
Scrubbing Media: UgnCleanPellets
Engineer: N/A
System Commissioned: October 2025
Process Location: East Splitter Box
Project Specifications:
| Airflow Rate, cfm | 300 |
| Inlet H2S Conc., ppm | 5 |
| Peak Conc., ppm | 10 |
Vessel Material: 5’ tall x 3.5’ diameter FRP with UV Gel Resin
Scrubbing Media: UgnCleanPellets
Engineer: N/A
System Commissioned: October 2025
Process Location: RAS Channel
Project Specifications:
| Airflow Rate, cfm | 300 |
| Inlet H2S Conc., ppm | 50 |
| Peak Conc., ppm | 200 |
Removal Efficiency: 99%
Vessel Material: 8’ tall x 8’ diameter FRP with UV Gel Resin
Scrubbing Media: UgnCleanPellets
Engineer: N/A
System Commissioned: October 2025